A general rule of thumb would be to visually inspect every one to two years, secondary injection testing every one to three years, and primary injection every three to five years or on major changes. The standards dictate how accurate relays must be, the response time, as well as the condition they must withstand. We also acquire protective device requirements in electric. Protection relays employ a wide range of configurable parameters to identify defects & trip the breaker in a controlled & selected manner. PSM – Plug Setting Multiplier (Current Setting Multiplier) What is PSM? 2). Power system stability means also. However, the relay should be vigilant at all times. Setting determines pick-up value/time.